Developer delivery records
What UAE developers report delivering, with a source and date for each figure.
- Developers with a delivery record
- 17 of 42
- Handover targets on file
- 266
UAE developers: delivery records on file
Delivery and handover figures from our developer profiles, as the developers report them, each traceable to a public source.
The records
| Developer | Measure | Value |
|---|---|---|
| Arada | Homes delivered since 2017 | 10,000+ (company figure) |
| Binghatti | Developments delivered | 50+ |
| Bloom Holding | Aldhay handover | 6 months early (2023) |
| BNW Developments | Completed projects | None as of November 2026 |
| DAMAC Properties | Homes handed over (September 2026) | 50,000+ |
| Danube Properties | Projects delivered (January 2026) | 20 |
| Deyaar | Homes handed over in 2026 | 2,100+ |
| Dubai Properties | Homes delivered at Villanova | 3,834 |
| Emaar Properties | Homes delivered since 2002 | 130,900+ |
| Major Developers | Completed projects | None as of November 2026 |
Sources: developer filings, results and public statements, as cited on each developer profile. Updated .
Delivery records on file
17 of 42 profiles carry a delivery figure: company claims, not audited results.
Aldar
Handover targets
- Mamsha Palm: Q1 2028 (under construction)
- Sama Yas: Q2 2028 (under construction)
- Athlon: Q3 2028 (under construction)
- Mandarin Oriental Residences, Saadiyat Cultural District: Q3 2028 (under construction)
- Verdes by Haven: Q3 2028 (under construction)
- Nikki Beach Residences: Q4 2028 (under construction)
- Rosso Bay Residences: Q4 2028 (under construction)
- Mamsha Garden: Q1 2029 (under construction)
- Fahid Beach Residences: Q2 2029 (under construction)
- The Wilds: Q2 2029 (under construction)
- Baccarat Residences Saadiyat: Q3 2029 (under construction)
- Fahid Beach Terraces: Q4 2029 (under construction)
- Rise by Athlon: Q4 2029 (under construction)
- Talay: Q4 2029 (launched)
- The Beach House Fahid: Q4 2029 (under construction)
- The Row Saadiyat: Q1 2030 (under construction)
- Yas Park Place: Q1 2030 (under construction)
- The Wilds Residences: Q2 2030 (under construction)
- The Canopies at Yas Point: Q3 2030 (under construction)
- Yas Riva Reserve: Q3 2030 (under construction)
- Al Ghadeer Gardens: Q4 2030 (under construction)
- The Orchids at Yas Acres: Q1 2031 (under construction)
- Al Ghadeer Parks: Q2 2031 (under construction)
- Sei Saadiyat: Q3 2031 (under construction)
Sources: Khaleej Times: Aldar reports record 2025 results (9 February 2026); Khaleej Times: Aldar H1 2026 profit rises as backlog drives earnings (29 July 2026) and 5 more on the profile. Checked 13 November 2026.
Arada
- Homes delivered since 2017
- 10,000+ (company figure)
Sources: Khaleej Times: Arada triples home sales to Dh17.3 billion (22 January 2026); Sharjah24: Arada sees sales triple in 2025 (22 January 2026) and 2 more on the profile. Checked 12 November 2026.
Azizi Developments
Handover targets
- Azizi Aliyah: Q4 2025 (ready)
- Riviera Rêve: Q4 2026 (under construction)
- Azizi Riviera: Q2 2027 (under construction)
- Azizi Sikander: Q2 2027 (under construction)
- Azizi Venice: 2027 (under construction)
- Azizi Wares: Q1 2028 (under construction)
- Azizi Wasel: Q1 2028 (under construction)
- Azizi Milan: Q2 2028 (under construction)
- Milan Heights: Q2 2028 (under construction)
- Azizi Leily: Q3 2028 (under construction)
- Azizi Lina: Q3 2028 (under construction)
- Azizi Creek Views IV: Q4 2028 (under construction)
- Azizi Jaddaf Beach Oasis: Q4 2028 (launched)
- Azizi Florence: Q3 2029 (under construction)
- Burj Azizi: 2029 (under construction)
- Azizi Creek Views III: Q3 2026 (under construction)
Sources: Gulf Construction: Azizi Developments news archive (2025 to 2026); ME Construction News: Azizi Riviera in MBR City enters final stage of delivery (13 August 2025) and 8 more on the profile. Checked 13 November 2026.
Beyond Developments
Handover targets
- Soulever by Beyond: Q1 2029 (launched)
- Arancia Yards: Q4 2029 (launched)
- Hado by Beyond: 2029 (launched)
- Passo by Beyond: Q4 2029 (launched)
Sources: Beyond Developments: about us; Omniyat: sukuk announcement describing the Beyond brand (26 February 2026) and 7 more on the profile. Checked 13 November 2026.
Binghatti
- Developments delivered
- 50+
- Homes delivered, H1 2026
- About 1,700
Handover targets
- Binghatti Aurora: Q2 2025 (ready)
- Binghatti Royale: Q4 2025 (ready)
- Binghatti Ghost: Q1 2026 (ready)
- Binghatti Starlight: Q1 2026 (ready)
- Binghatti Elite: Q2 2026 (ready)
- Binghatti Hillcrest: Q4 2026 (under construction)
- Binghatti Hills: Q4 2026 (under construction)
- Binghatti Skyhall: Q4 2026 (under construction)
- Binghatti Skyrise: Q4 2026 (under construction)
- Mercedes-Benz Places | Binghatti: Q4 2026 (under construction)
- One by Binghatti: Q4 2026 (under construction)
- Binghatti Hillviews: Q4 2026 (ready)
- Binghatti Aquarise: Q1 2027 (under construction)
- Binghatti Flare: Q2 2027 (under construction)
- Burj Binghatti Jacob & Co Residences: Q2 2027 (under construction)
- Binghatti Luxuria: Q3 2027 (under construction)
- Bugatti Residences by Binghatti: Q3 2027 (under construction)
- Binghatti Cullinan: Q4 2027 (under construction)
- Binghatti Skyblade: Q4 2027 (under construction)
- Binghatti Skyflame: Q4 2027 (under construction)
- Binghatti Titania: Q4 2027 (under construction)
- Binghatti Vintage: Q4 2027 (under construction)
- Binghatti Wraith: Q4 2027 (launched)
- Mercedes-Benz Places | Binghatti City: Q4 2027 (under construction)
- Binghatti Etherea: Q1 2028 (under construction)
- Binghatti Skyterraces: Q1 2028 (under construction)
- Binghatti Starfall: Q3 2028 (launched)
- Vision Iconic: Q4 2028 (under construction)
- Tilal Binghatti: Q2 2029 (launched)
Sources: Binghatti: H1 2026 financial results (27 July 2026); Binghatti: sales and delivery update (25 March 2026) and 6 more on the profile. Checked 12 November 2026.
Bloom Holding
- Aldhay handover
- 6 months early (2023)
Sources: Bloom Holding: Who we are; Bloom Holding: Press releases and 3 more on the profile. Checked 12 November 2026.
BNW Developments
- Completed projects
- None as of November 2026
Handover targets
- Pelagia: Q4 2027 (under construction)
- Taj Wellington Mews: Q1 2028 (under construction)
- FashionTV Acacia: Q2 2028 (under construction)
- Orvessa Residences: Q3 2028 (under construction)
- Tonino Lamborghini Residences: Q4 2028 (under construction)
- Dolce Residences by Wyndham: Q4 2028 (under construction)
- Radisson Blu Residences RAK Central: Q4 2029 (under construction)
Sources: BNW Developments: About us; BNW Developments: Groundbreaking of Tonino Lamborghini Residences and La Perla (1 May 2026) and 11 more on the profile. Checked 13 November 2026.
DAMAC Properties
- Homes handed over (September 2026)
- 50,000+
- Handover target for 2026
- 8,800+ homes
Handover targets
- Harbour Lights by de GRISOGONO: Q4 2027 (under construction)
- Altitude de GRISOGONO: Q1 2028 (under construction)
- Golf Greens: Q1 2028 (under construction)
- Canal Heights de GRISOGONO: Q2 2028 (under construction)
- DAMAC Riverside: Q2 2028 (under construction)
- Canal Heights 2 de GRISOGONO: Q3 2028 (under construction)
- ELO: Q3 2028 (under construction)
- Shoreline by DAMAC: Q3 2028 (under construction)
- Couture by Cavalli: Q4 2028 (under construction)
- DAMAC Bay 2 by Cavalli: Q4 2028 (under construction)
- DAMAC Bay by Cavalli: Q4 2028 (under construction)
- DAMAC Casa: Q4 2028 (under construction)
- ELO 2: Q4 2028 (under construction)
- ELO 3: Q4 2028 (under construction)
- DAMAC Lagoons District Valencia: Q1 2029 (launched)
- DAMAC Riverside Views: Q1 2029 (under construction)
- Lagoon Views: Q1 2029 (under construction)
- Volta: Q2 2029 (under construction)
- DAMAC District: Q3 2029 (under construction)
- DAMAC Islands: Q4 2029 (under construction)
- Safa Gate: Q4 2029 (under construction)
- Safa Two de GRISOGONO: Q4 2029 (under construction)
- Sorrento Lagoon Views: Q1 2030 (launched)
- Chelsea Residences: Q2 2030 (under construction)
- DAMAC Islands 2: Q4 2030 (under construction)
Sources: Khaleej Times: Damac crosses 50,000 home handovers, targets 8,800 more in 2026 (1 September 2026); Zawya (DAMAC press release): handover of 8,800 units in 2026 and 3 more on the profile. Checked 13 November 2026.
Danube Properties
- Projects delivered (January 2026)
- 20
Handover targets
- Diamondz by Danube: Q4 2027 (under construction)
- Bayz 101 by Danube: Q2 2028 (under construction)
- Aspirz by Danube: Q4 2028 (under construction)
- Bayz 102 by Danube: Q2 2029 (under construction)
- Greenz by Danube: Q4 2029 (launched)
- Serenz by Danube: 2029 (launched)
- Shahrukhz Residences by Danube: Q4 2029 (launched)
Sources: Danube Properties: about us and project list; Danube Properties: 1% payment plan and 5 more on the profile. Checked 13 November 2026.
Dar Global
Handover targets
- DaVinci Tower by Pagani: 2025 (ready)
- D Villas: Q2 2028 (under construction)
- Trump International Hotel & Tower Dubai: Q4 2031 (under construction)
Sources: Dar Global PLC (RNS): Full Year Results 2025 (11 March 2026); Dar Global PLC (RNS): Half Year 2026 Results (24 September 2026) and 13 more on the profile. Checked 13 November 2026.
Deyaar
- Homes handed over in 2026
- 2,100+
- Completed projects
- 30+ (company figure)
Sources: Deyaar: About us; Deyaar: FY 2025 results announcement and 4 more on the profile. Checked 12 November 2026.
Dubai Properties
- Homes delivered at Villanova
- 3,834
Sources: Dubai Properties: about Dubai Holding Real Estate; Dubai Properties: project list and off-plan mortgage announcement (16 April 2026) and 3 more on the profile. Checked 12 November 2026.
Ellington Properties
Handover targets
- Ocean House: Q4 2026 (under construction)
- One River Point: Q2 2027 (under construction)
- Playa Del Sol: Q4 2027 (under construction)
- The Hillgate: Q4 2027 (under construction)
- Belgravia Gardens: Q3 2028 (under construction)
- Costa Mare: Q3 2028 (under construction)
- Ellington Sands: Q4 2028 (under construction)
- Eltiera Views: Q4 2029 (launched)
- Soto Grande: Q4 2029 (under construction)
- The Meriva Collection: Q2 2030 (launched)
- Everly Place: Q4 2030 (launched)
Sources: Ellington Properties: about us; Ellington Properties: website project and location listings and 10 more on the profile. Checked 13 November 2026.
Emaar Properties
- Homes delivered since 2002
- 130,900+
Handover targets
- Beach Mansion: Q4 2025 (ready)
- Park Horizon: Q3 2026 (ready)
- Marina Shores: Q4 2026 (under construction)
- Park Gate 2: Q1 2027 (under construction)
- Clearpoint: Q3 2027 (under construction)
- Greenside Residence: Q3 2027 (under construction)
- Parkside Views: Q3 2027 (under construction)
- Creek Waters 2: Q4 2027 (under construction)
- Address Residences Al Marjan Island: Q1 2028 (under construction)
- Aeon: Q2 2028 (under construction)
- Bayview by Address Resorts: Q3 2028 (under construction)
- Ocean Cove: Q3 2028 (under construction)
- Valo: Q3 2028 (under construction)
- Club Place: Q4 2028 (under construction)
- Golf Acres: Q4 2028 (under construction)
- Golf Dale: Q4 2028 (under construction)
- Golf Hillside: Q4 2028 (under construction)
- Golf Point: Q4 2028 (under construction)
- Pier Point: Q4 2028 (under construction)
- Altus: Q1 2029 (under construction)
- Greenspoint: Q1 2029 (under construction)
- Hillsedge: Q1 2029 (under construction)
- Parkwood: Q1 2029 (under construction)
- Terra Heights: Q1 2029 (under construction)
- Chevalia Estate 2: Q2 2029 (under construction)
- Chevalia Fields: Q2 2029 (under construction)
- Golf Verge: Q2 2029 (under construction)
- Greencrest: Q2 2029 (under construction)
- Montura: Q2 2029 (under construction)
- Montura 2: Q2 2029 (under construction)
- Montura 3: Q2 2029 (under construction)
- Palace Residences Hillside: Q2 2029 (under construction)
- Rosehill: Q2 2029 (under construction)
- Selvara: Q2 2029 (under construction)
- Vida Residences Hillside: Q2 2029 (under construction)
- Address Residences Zabeel: Q3 2029 (under construction)
- Albero: Q3 2029 (under construction)
- Altan: Q3 2029 (under construction)
- Golf Hills: Q3 2029 (under construction)
- Golf Meadow: Q3 2029 (under construction)
- Grove Ridge: Q3 2029 (launched)
- Lyvia by Palace: Q3 2029 (under construction)
- Marina Cove: Q3 2029 (under construction)
- Montiva by Vida: Q3 2029 (under construction)
- Silva: Q3 2029 (under construction)
- Vista Ridge: Q3 2029 (launched)
- Baystar by Vida: Q4 2029 (under construction)
- Ovelle: Q4 2029 (launched)
- Palace Residences Hillside B: Q4 2029 (launched)
- Sera 2: Q4 2029 (launched)
- Terra Gardens: Q4 2029 (under construction)
- Creek Haven: Q1 2030 (launched)
- Golf Fields: Q1 2030 (launched)
- Golf Vale: Q1 2030 (launched)
- Serro: Q1 2030 (launched)
- Terra Woods: Q1 2030 (launched)
- Fior 2: Q1 2030 (launched)
- Aurea: Q2 2030 (launched)
- Creek Bay: Q2 2030 (launched)
- Serro 2: Q2 2030 (launched)
- Fior 1: Q3 2030 (launched)
- Salva: Q3 2030 (launched)
- Valia: Q3 2030 (launched)
- Golf Trails: Q4 2030 (launched)
- Avarra by Palace: Q2 2031 (launched)
- Mangrove: Q3 2026 (under construction)
Sources: Emaar press release: H1 2026 results (7 August 2026); Emaar corporate website: communities, homes delivered, land bank and 6 more on the profile. Checked 13 November 2026.
H&H Development
Handover targets
- Eden House The Park: 2026 (under construction)
- Eden House Za'abeel: 2027 (under construction)
- Janu Dubai Hotel & Residences: 2027 (under construction)
- Dubai Harbour Residences: Q1 2028 (under construction)
- Eden Hills: Q2 2028 (under construction)
- The Residences, Peninsula Dubai: Q1 2029 (under construction)
- Four Seasons Private Residences Dubai at DIFC: 2029 (under construction)
- Aman Residences Dubai: 2029 (launched)
- Rosewood Residences Dubai: Q4 2029 (launched)
Sources: H&H: who we are; H&H: development projects and 6 more on the profile. Checked 13 November 2026.
LEOS Developments
Handover targets
- Weybridge Gardens 4: Q2 2027 (under construction)
- Weybridge Gardens 5: Q2 2027 (under construction)
- Kensington Gardens: Q4 2027 (under construction)
- Knightsbridge: Q4 2027 (under construction)
- Knightsbridge 2: Q2 2028 (under construction)
- LEOS Royal: Q4 2028 (launched)
Sources: LEOS Developments: about us; LEOS Developments: our people and 7 more on the profile. Checked 13 November 2026.
Major Developers
- Completed projects
- None as of November 2026
Sources: Major Developments official website; Khaleej Times: World's highest rooftop beach to be built on Al Marjan Island (30 April 2024) and 2 more on the profile. Checked 12 November 2026.
Modon
Handover targets
- Nawayef East: Q4 2028 (under construction)
- Hudayriyat Golf Estates: Q3 2030 (launched)
- Wadeem Gardens: Q2 2031 (launched)
Sources: Modon: 2025 results announcement (18 February 2026); Modon: Media centre (2026 announcements) and 8 more on the profile. Checked 13 November 2026.
Nakheel
- Jebel Ali Village handover, from August 2026
- 892 homes
Sources: Nakheel: about us; Nakheel: communities and 5 more on the profile. Checked 12 November 2026.
Object 1
- Verified completions
- 2 towers (both 2026)
Sources: Object 1: website (projects, offices, prices); Gulf Construction: Object 1 announces completion of prime JVC residential tower (17 March 2026) and 3 more on the profile. Checked 12 November 2026.
One Development
- First scheduled UAE handover
- Q4 2027
Handover targets
- DO Hotels & Residences Dubai Islands: Q4 2027 (launched)
- Laguna Residence: Q4 2027 (under construction)
- ONE Residence: Q2 2028 (launched)
Sources: One Development: our developments; One Development: Laguna Residence and 5 more on the profile. Checked 13 November 2026.
RAK Properties
- Homes ready for handover in 2026
- 1,400+ (company target)
Sources: RAK Properties: 2025 full-year results (6 February 2026); RAK Properties: Q1 2026 results and 2 more on the profile. Checked 12 November 2026.
Samana Developers
- Handovers to date (company website)
- 6
Handover targets
- Samana Ocean Pearl: Q4 2027 (under construction)
- Samana Ocean Pearl 2: Q4 2027 (under construction)
- Samana Ocean Bay: Q2 2028 (under construction)
- Samana Boulevard Heights: Q2 2029 (under construction)
- Samana Greenfield: Q2 2029 (launched)
- Samana South Haven: Q2 2029 (launched)
- Samana South Haven 2: Q2 2029 (launched)
- Samana Greenfield 2: Q3 2029 (launched)
- Samana Portside: Q3 2029 (launched)
- Samana Downtown One: Q4 2029 (launched)
Sources: Samana Developers: about us; Samana Developers: website (starting prices, project locations) and 5 more on the profile. Checked 13 November 2026.
Select Group
- Homes handed over
- 10,000+
Handover targets
- Artistry One Residences: 2029 (launched)
- Artistry Two Residences: 2029 (launched)
- Six Senses Residences Dubai Marina: 2029 (under construction)
Sources: Select Group: about us; Select Group: website (company figures and projects) and 4 more on the profile. Checked 13 November 2026.
Sobha Realty
- Planned Dubai handovers, 2026
- 6,819 homes
Handover targets
- Golf Ridges at Sobha One: Q4 2026 (under construction)
- SeaHaven Sky Edition: Q4 2026 (under construction)
- Delphine Beach Residences: Q4 2027 (under construction)
- Aquamarine Beach Residences: Q2 2028 (under construction)
- Sobha Aquamont: Q2 2028 (under construction)
- Coastline Beach Residences: Q3 2028 (under construction)
- Florine Beach Residences: Q3 2028 (under construction)
- Coral Beach Villas: Q4 2028 (under construction)
- Coraline Beach Residences: Q4 2028 (under construction)
- Palm Grove Villas: Q4 2028 (under construction)
- Skyscape Altius: Q4 2028 (under construction)
- Skyscape Aura: Q4 2028 (under construction)
- Bayside Marina Residences: Q1 2029 (under construction)
- Pierside Marina Residences: Q1 2029 (under construction)
- Starline Beach Residences: Q2 2029 (under construction)
- Yachtside Marina Residences: Q2 2029 (under construction)
- Sobha AquaCrest: Q2 2029 (under construction)
- Bayfront Marina Residences: Q3 2029 (under construction)
- Pristine Beach Residences: Q3 2029 (under construction)
- The Brooks at Sobha Sanctuary: Q3 2029 (under construction)
- The Greens at Sobha Sanctuary: Q3 2029 (under construction)
- The Willows at Sobha Sanctuary: Q3 2029 (under construction)
- Canalside Marina Residences: Q4 2029 (under construction)
- River Cove Residences: Q4 2029 (under construction)
- The Eden at Sobha Central: Q4 2029 (under construction)
- The Element at Sobha One: Q4 2029 (under construction)
- The Grove at Sobha Sanctuary: Q4 2029 (under construction)
- The Horizon at Sobha Central: Q4 2029 (under construction)
- The Orchard at Sobha City: Q4 2029 (under construction)
- The Terraces at Sobha City: Q4 2029 (under construction)
- The Woods Abode: Q4 2029 (under construction)
- The Woods Retreat: Q4 2029 (under construction)
- The Woods Serenity: Q4 2029 (under construction)
- The Mirage at Sobha Central: Q1 2030 (under construction)
- Capeside Marina Residences: Q2 2030 (under construction)
- Pearlside Marina Residences: Q3 2030 (under construction)
- The Woods Altura: Q4 2030 (under construction)
- The Woods Elysian: Q4 2030 (under construction)
- The Woods Horizon: Q4 2030 (under construction)
- Tranquil Beach Residences: 2030 (launched)
Sources: Sobha Realty: Investor Update H1 FY26 (August 2026); Khaleej Times: Sobha Realty targets record 6,819 home handovers in Dubai (21 July 2026) and 5 more on the profile. Checked 13 November 2026.
Covers the 276 developments documented on this site, not the whole market.
About the data
How every figure on this page is made, where it comes from and how to reuse it.
Methodology
- Delivery records: every delivery, handover or completion figure in our developer profiles, as worded there. Most are company-reported (results statements, press releases, developer websites); each profile lists its public sources and the date it was last checked.
- Handover targets: the completion target each documented development states, from its own sources. A target is never shown as a delivery.
- Coverage is stated plainly: only developers whose profile carries a delivery figure appear, and the count is shown at the top of the page.
Sources and licences
- Khaleej Times: Khaleej Times: Aldar reports record 2025 results (9 February 2026)Licence: Facts with attribution. Checked 13 November 2026.
- Khaleej Times: Khaleej Times: Arada triples home sales to Dh17.3 billion (22 January 2026)Licence: Facts with attribution. Checked 13 November 2026.
- Gulf Construction: Gulf Construction: Azizi Developments news archive (2025 to 2026)Licence: Facts with attribution. Checked 13 November 2026.
- Beyond Developments: Beyond Developments: about usLicence: Facts with attribution. Checked 13 November 2026.
- Binghatti: Binghatti: H1 2026 financial results (27 July 2026)Licence: Facts with attribution. Checked 13 November 2026.
- Bloom Holding: Bloom Holding: Who we areLicence: Facts with attribution. Checked 13 November 2026.
- BNW Developments: BNW Developments: About usLicence: Facts with attribution. Checked 13 November 2026.
- Khaleej Times: Khaleej Times: Damac crosses 50,000 home handovers, targets 8,800 more in 2026 (1 September 2026)Licence: Facts with attribution. Checked 13 November 2026.
- Danube Properties: Danube Properties: about us and project listLicence: Facts with attribution. Checked 13 November 2026.
- Dar Global PLC (RNS): Dar Global PLC (RNS): Full Year Results 2025 (11 March 2026)Licence: Facts with attribution. Checked 13 November 2026.
- Deyaar: Deyaar: About usLicence: Facts with attribution. Checked 13 November 2026.
- Dubai Properties: Dubai Properties: about Dubai Holding Real EstateLicence: Facts with attribution. Checked 13 November 2026.
- Ellington Properties: Ellington Properties: about usLicence: Facts with attribution. Checked 13 November 2026.
- Emaar press release: Emaar press release: H1 2026 results (7 August 2026)Licence: Facts with attribution. Checked 13 November 2026.
- H&H: H&H: who we areLicence: Facts with attribution. Checked 13 November 2026.
- LEOS Developments: LEOS Developments: about usLicence: Facts with attribution. Checked 13 November 2026.
- Major Developments official website: Major Developments official websiteLicence: Facts with attribution. Checked 13 November 2026.
- Modon: Modon: 2025 results announcement (18 February 2026)Licence: Facts with attribution. Checked 13 November 2026.
- Nakheel: Nakheel: about usLicence: Facts with attribution. Checked 13 November 2026.
- Object 1: Object 1: website (projects, offices, prices)Licence: Facts with attribution. Checked 13 November 2026.
- One Development: One Development: our developmentsLicence: Facts with attribution. Checked 13 November 2026.
- RAK Properties: RAK Properties: 2025 full-year results (6 February 2026)Licence: Facts with attribution. Checked 13 November 2026.
- Samana Developers: Samana Developers: about usLicence: Facts with attribution. Checked 13 November 2026.
- Select Group: Select Group: about usLicence: Facts with attribution. Checked 13 November 2026.
- Sobha Realty: Sobha Realty: Investor Update H1 FY26 (August 2026)Licence: Facts with attribution. Checked 13 November 2026.
More market data
- Cost to buy comparedDubai, Abu Dhabi and Ras Al Khaimah against England and Singapore.
- Area prices and rentsPrice per sq ft and average rents by area, compiled from published figures.
- Rental yields by areaPublished gross yields by area, each with its source and date.
- Service charges by areaPublished service charges for named buildings, in AED per sq ft.
- Off-plan launch trackerDocumented launches with dates, starting prices and plans.
- Payment plan explorerHow documented plans split between construction and handover.
- Golden Visa explorerThe property thresholds for UAE residence, and a checker.
Checking a developer before you reserve?
We'll pull their registered projects, completion record and escrow details, and tell you what we'd ask them.
- Current price list and availability, direct from the developer
- No fee to you on off-plan purchases: the developer pays us
- One salaried adviser, not on commission, from first call to handover